Yes. The method is the same on every project, from Alfragide to Beja, with our own team and certification delivered at the end of the works.
Structured cabling
Every structured cabling project starts with an on-site survey, before the quote. Outlets are counted against the future layout, the cable is CAT6 or CAT6A depending on distance and service life, and fibre optics link buildings where copper cannot reach. At the end, we deliver the Fluke certification of every outlet in a report.
The works are carried out while the company keeps working: in phases, by zone and out of hours when there is no alternative.
Business Wi-Fi
Business wireless networks start with on-site coverage measurement, never estimated from the floor plan. Cabled access points with PoE, Wi-Fi 6 and Wi-Fi 7, seamless roaming and a separate guest network. Because management is centralised, most fixes are made remotely.