Office relocation: the network ready before day one
When moving offices, the dreaded part isn't the logistics — it's the IT. The desks arrive and stay put; it's the network, the servers, the phones and the internet that decide whether the business is working on Monday morning.
Network set up previously
Cabling, rack and Wi-Fi ready and tested before anyone moves in.
Internet booked on time
Operator error is the number one cause of delays. Address this first.
Servers at the weekend
The crossing takes place outside of hours, so as not to waste a day.
An opportunity
It is the right time to fix what was poorly set up in the old space.
What we do when moving house
Survey of the new space
Floor plans, workstations, meeting rooms, reception and where the rack is going to be.
Cat6A network points, inter-floor fibre, cable trays and an organised and labelled cabinet.
Site survey in the new space — you don't replicate the old floor plan in a different building.
Internet and circuits
Order, monitoring of the operator's deadline and a reserve call when the risk justifies it.
Servers and workstations
Dismantling, transport, assembly and commissioning, with validation carried out before the team arrives.
Main system and extensions in the new premises, with numbers ported without interruption.
How to do it without losing a day's work
1
Six to eight weeks before
Survey, design and, above all, ordering of the internet circuits.
2
Three weeks prior
Cabling and rack installed and certified in the new, still empty space.
3
Moving weekend
Servers and stations pass, are booted up and tested before Monday.
4
First day
We are at the venue. It is the day when the small things appear — and they are sorted on the spot.
What cannot fail
In order of risk: the internet deadline (it is the only one that depends on neither us nor the client), the number of network points per workstation (two, not one), the position of the rack — ventilated, closed and accessible —, the power supply and the UPSs, and the list of who needs to be contactable on the weekend of the move.
Frequently Asked Questions
How much notice should we give?
Six to eight weeks before the move, mainly because of internet circuit installation lead times, which are beyond our control.
Is it necessary to close the company?
No. The migration of the servers takes place at the weekend or out of hours. The network in the new space is already ready and tested by then.
Do you also deal with the physical relocation of the equipment?
As for the IT equipment, yes — servers, racks, workstations and phones. The furniture is up to the removal company.
What if the new office already has a network installed?
We verify and certify what is there. It is common to find old, uncertified cabling that passes basic tests and fails under load.
See also: Networks and structured cabling · Business Wi-Fi · IT Unlimited