Redes informáticas para empresas
Uma rede informática robusta é bem mais do que cabos bem passados: é cablagem estruturada certificada, Wi-Fi empresarial dimensionado para a carga real, switching e firewall bem configurados, e um bastidor documentado que qualquer técnico consegue perceber. É esse conjunto — projetado, instalado segundo norma e testado no fim — que distingue uma rede profissional de uma que funciona até ao dia em que a carga aumenta.
Measured certification
Every point is tested with certification equipment and supplied with a report.
Cat6A and fibre
Copper to the workstations, fibre between racks and floors.
Tidy chassis
Patch panels, labelling and cable management — for whoever comes next.
Documented
Floor plan showing socket numbering, handed over to the client at the end of the project.
Why certification matters
A badly terminated cable works. It connects, transfers files, nobody complains — until there is serious traffic, CCTV, PoE or a meeting with everyone on the same switch. That is when frame errors, intermittent drops and the wild goose chase for a problem nobody can reproduce appear. The certification test measures attenuation, crosstalk and length on each pair, and states, socket by socket, whether the installation complies with the standard. Without that report, the network is unproven.
What we installed
Cat6A copper cabling
Network points for workstations, printers, access points and cameras, with two points per workstation.
Fibre optic
Connection between backrooms, floors and buildings, with fusion splicing and optical measurement boxes.
Behind the scenes and energy
Sized, ventilated and enclosed rack, with patch panels, cable managers and UPS.
PoE switch
Managed PoE switches for access points, cameras and phones.
Guttering and infrastructure
Cable routes, trunking and chases, carried out with the minimum amount of building work possible.
CCTV
Cabling and points for IP cameras, over the same infrastructure.
How a construction project runs
1
Survey
Space visit, plants and number of points per zone.
2
Design and budget
Route, quantities and deadlines, with the price fixed before starting.
3
Execution
Routing, termination and rack assembly, phased so as not to interrupt operations.
4
Certification
Measurement of all points and delivery of the report and the numbered plan.
Frequently Asked Questions
Is the certification charged separately?
No. It is included — an installation without a certification report is not a finished installation.
How many points per workstation?
Two, as a rule. It costs slightly more during construction and avoids desktop switches and cables all over the floor a year down the line.
Can it be done while the office is operating?
Yes, in phases and with the noisier work done outside normal hours. It's the most common scenario.
Do you work on new builds or only existing spaces?
In both. In new builds it's cheaper and cleaner, because you work alongside the builder instead of fixing things afterwards.
Do you certify wiring installed by others?
Yes. We measure and deliver the report with the actual state — it is common to find installations that pass a basic test and fail certification.
See also: Office relocation · Business Wi-Fi · IT Unlimited